Solar Power Plant

Solar Power Plant

Power Plants

Full EPC for Utility-Scale Solar Installations.

Grid-scale
execution.

We deliver full Engineering, Procurement, and Construction (EPC) services for large-scale solar photovoltaic power plants. From initial site appraisal to final commissioning, our experienced team manages every phase with precision.

Our turnkey approach ensures seamless project delivery — covering feasibility studies, detailed engineering design, equipment procurement from Tier 1 manufacturers, professional construction management, and rigorous testing & commissioning protocols.

Discuss Project

Our EPC Process

1
Site Appraisal & Feasibility

Comprehensive evaluation of terrain, solar irradiance, grid connectivity, and regulatory requirements.

2
Detailed Engineering Design

Precise system architecture, electrical layouts, structural engineering, and BOS design.

3
Procurement & Construction

Sourcing Tier 1 equipment, on-site installation, quality assurance, and safety compliance.

4
Testing & Commissioning

Rigorous performance testing, grid synchronization, and final handover with O&M support.

5 MW Sangel
Flagship Project · Upcoming

5 MW Sangel Solar Park

IG Solar's flagship 5 MW grid-connected, ground-mounted solar park at Sangel in Nuh district, Haryana. The plant will supply clean power to the state grid under a long-term Power Purchase Agreement with the Haryana Power Purchase Centre (HPPC).

  • Grid-connected, ground-mounted solar PV
  • Tier-1 Made-in-India modules (Aroma Solar)
  • String inverters with 11 kV evacuation to the 33 kV Ujina substation
  • Target commissioning: by March 2027
Project Snapshot

Sangel at a Glance

ParameterDetails
Capacity5 MW
LocationSangel, Nuh district, Haryana
TypeGrid-connected, ground-mounted solar PV
OfftakerHaryana Power Purchase Centre (HPPC) — long-term PPA
ModulesAroma Solar (Tier-1, Made in India)
Evacuation11 kV line to 33 kV Ujina substation
Est. Annual Generation~7.5–8 million units*
StatusUnder development — target commissioning by March 2027

*Indicative estimate; actual generation depends on irradiation, design and operating conditions. Image: artist’s impression.

From Concept to Operations

Our Path to Commissioning

1Concept
2Development & Approvals
3Financial Closure
4EPC
5Commissioning
6Long-Term O&M